It’s been a while since I provided an update on the garage. That doesn’t mean things have been idle, although they haven’t been moving as fast as I would like. Today I completed the electrical rough-in inspection. This included the ditch being dug (by hand), pulling all the wire and wiring up the subpanel. In addition, since the last update, we repaved the driveway to tie in the garage.